Vega Foyer Chandelier 100
Tax included where applicable. Delivery and commissioning arranged by your concierge.
NAVERZIX Grand — light at estate scale
Double-height halls ask a question; the Vega answers in metres — lantern or open-crystal plans, load paths calculated into the structure, and the whole first impression photographed lit before it ships.
Estate-scale light is engineering before it is sparkle: we survey the void, calculate the load path into the structure, and specify the winch or the reinforced rose before a single arm is cast. The drawings ship with the fixture — hook heights, chain runs, service positions — because a chandelier this size is a small building hung upside down.
Design & Craft
- Lantern and open-crystal plans for double heights
- Method statement: winch, scaffold, crew booked
- Assembled once in the works, photographed, then shipped
- Numbered sections; nothing improvised at height
- Commissioned by our own crews to the written scene
- Drawings, protocol and strand maps in the file
Specifications
| Diameter | Ø 100 cm |
| Setting | Double-height foyers |
| Service | Winch option, stated |
| Crystal | Bohemian, hand-hung |
| Weight | ≈ 45.9 kg |
| Warranty | 5 yr; trimmings stocked 15 |
Care
Dust monthly with white gloves — a slow waltz around the fixture, no products. Wash yearly: one strand at a time in warm water and our crystal soap, dried lint-free, never twisted on its pin. Power off before any touch; two hands for any drop above eye level.
Lost or chipped trimmings are stocked for fifteen years — quote the pattern number from your protocol and the replacement ships cut, polished and ready to hang.
Questions, Answered
Can you match a historic fixture?
Yes — pattern-matching is half the bespoke book. Bring photographs and one surviving drop if you have it; the works reads the cut, the arm profile and the era, and quotes a faithful sibling.
How do you install at stairwell height?
With engineering, not courage: surveyed void, calculated load path, scaffold or winch as the drawings dictate, and our own crew on the ropes. The method statement is part of the order file.
The NAVERZIX Promise
One contract, one schedule, one responsible person from survey to the first switch-on; fixed dates in writing, delays compensated rather than excused.