Serenada Ballroom Suite — Chandelier & Six Sconces
Tax included where applicable. Delivery and commissioning arranged by your concierge.
NAVERZIX Grand — light at estate scale
The Serenada lights the whole dance: a centre chandelier with its matched sconce court in one finish, scene-wired so waltz, dinner and midnight live in the wall, hook loads engineered per room.
Estate-scale light is engineering before it is sparkle: we survey the void, calculate the load path into the structure, and specify the winch or the reinforced rose before a single arm is cast. The drawings ship with the fixture — hook heights, chain runs, service positions — because a chandelier this size is a small building hung upside down.
Design & Craft
- Method statement: winch, scaffold, crew booked
- Chandelier with matched sconce suites, one finish
- Void surveyed; load path calculated into structure
- The suite photographed lit before it ships
- Commissioned by our own crews to the written scene
- Numbered sections; nothing improvised at height
Specifications
| Suite | Chandelier + 6 sconces |
| Scenes | Waltz / dinner / midnight |
| Finish | One book, matched |
| Crystal | Bohemian, hand-hung |
| Weight | ≈ 77.7 kg |
| Warranty | 5 yr; trimmings stocked 15 |
Care
Dust monthly with white gloves — a slow waltz around the fixture, no products. Wash yearly: one strand at a time in warm water and our crystal soap, dried lint-free, never twisted on its pin. Power off before any touch; two hands for any drop above eye level.
Lost or chipped trimmings are stocked for fifteen years — quote the pattern number from your protocol and the replacement ships cut, polished and ready to hang.
Questions, Answered
What is a chandelier winch and do I need one?
A motorised lift that lowers the fixture to arm height for cleaning and bulb changes. Above four metres of hanging height we recommend one; above six we rarely sell without.
How long does a commission take?
Twelve to twenty weeks from approved maquette depending on scale — crystal cutting is the honest bottleneck. The schedule is written into the contract, with the fitting week booked from day one.
The NAVERZIX Promise
One contract, one schedule, one responsible person from survey to the first switch-on; fixed dates in writing, delays compensated rather than excused.