Kadence Ballroom Suite — Grand
Tax included where applicable. Delivery and commissioning arranged by your concierge.
NAVERZIX Grand — light at estate scale
The Kadence lights the whole dance: a centre chandelier with its matched sconce court in one finish, scene-wired so waltz, dinner and midnight live in the wall, hook loads engineered per room.
Commissions run like architecture: a lighting brief, a maquette or render, a crystal sample tray on your table, then the works. Our largest frames leave in numbered sections with a fitting crew booked to the same week, and every one is assembled once in the works, photographed, then taken apart for the journey — nothing is improvised at height.
Design & Craft
- Commissioned by our own crews to the written scene
- Hook loads and hanging heights engineered per room
- Scene-wired: waltz, dinner and midnight in the wall
- Chandelier with matched sconce suites, one finish
- The suite photographed lit before it ships
- Void surveyed; load path calculated into structure
Specifications
| Suite | Chandelier + 10 sconces |
| Scenes | Waltz / dinner / midnight |
| Finish | One book, matched |
| Crystal | Bohemian, hand-hung |
| Weight | ≈ 105 kg |
| Warranty | 5 yr; trimmings stocked 15 |
Care
Crystal asks for gloves, patience and off-switches: dust with the current off, wash strand by strand yearly, and let the drops air-dry on a towel rather than a radiator. Brass frames want a soft cloth only — patina is biography, not neglect.
If the sparkle dulls unevenly, the cause is usually a cleaning spray from the supermarket; ours is pH-neutral and film-free, and a bottle lives in every care kit.
Questions, Answered
How do you install at stairwell height?
With engineering, not courage: surveyed void, calculated load path, scaffold or winch as the drawings dictate, and our own crew on the ropes. The method statement is part of the order file.
How long does a commission take?
Twelve to twenty weeks from approved maquette depending on scale — crystal cutting is the honest bottleneck. The schedule is written into the contract, with the fitting week booked from day one.
The NAVERZIX Promise
One contract, one schedule, one responsible person from survey to the first switch-on; fixed dates in writing, delays compensated rather than excused.