Chatelaine Empire Cascade 80 — Tiered
Tax included where applicable. Delivery and commissioning arranged by your concierge.
NAVERZIX Crystal — the ballroom, remembered
The Chatelaine falls rather than hangs: rings of hand-pinned strands descending to a polished crystal ball, a cascade that fills high halls and stair voids with graded, unhurried sparkle.
The crystal work happens the slow way: Bohemian glass cut on rotating stone wheels, each facet counted against the pattern card, each drop polished to fire and hung on bronze pins by hand. A NAVERZIX chandelier arrives with its crystal dressed in the works — strand by strand, photographed for the record — so the fixture that reaches your ceiling sparkles in the same order the master approved.
Design & Craft
- Empire cascade: rings of strands falling to a crystal ball
- Cast brass and bronze frames, chased and honestly plated
- Tiered silhouettes that fill stair voids and high halls
- Bohemian crystal, cut on stone wheels and polished to fire
- Hung, balanced and dressed by NAVERZIX's own electricians
- E14 ceramic sockets; silicone-sleeved wiring, EN 60598 tested
Specifications
| Format | Ø 80 cm, tiered |
| Fall | Strands to crystal sphere |
| Crystal | Bohemian, hand-cut |
| Lighting | Concealed ring + candles, 2700 K |
| Weight | ≈ 46.6 kg |
| Warranty | 5 yr; trimmings stocked 15 |
Care
Dust monthly with white gloves — a slow waltz around the fixture, no products. Wash yearly: one strand at a time in warm water and our crystal soap, dried lint-free, never twisted on its pin. Power off before any touch; two hands for any drop above eye level.
Lost or chipped trimmings are stocked for fifteen years — quote the pattern number from your protocol and the replacement ships cut, polished and ready to hang.
Questions, Answered
How high should it hang?
Over a table: 75–90 cm above the top. In a free room: at least 210 cm of head clearance. The chain or stem is cut to your survey measurements before delivery, so the fixture arrives at its final length.
Will my ceiling take the weight?
Every listing states the fixture weight and the fixing it needs. Our electricians verify the ceiling on survey, and for joists or hollow slabs we fit the rated rose or spreader plate before hanging — the check is part of installation, not an extra.
The NAVERZIX Promise
One contract, one schedule, one responsible person from survey to the first switch-on; fixed dates in writing, delays compensated rather than excused.