Applique Commission — Estate
Tax included where applicable. Delivery and commissioning arranged by your concierge.
NAVERZIX Grand — light at estate scale
The Applique begins as a conversation and ends as a one-of-one: brief, maquette, a crystal tray on your table, then twelve to twenty scheduled weeks of the works — and a drawing that retires the day the fixture hangs.
Commissions run like architecture: a lighting brief, a maquette or render, a crystal sample tray on your table, then the works. Our largest frames leave in numbered sections with a fitting crew booked to the same week, and every one is assembled once in the works, photographed, then taken apart for the journey — nothing is improvised at height.
Design & Craft
- Twelve to twenty weeks, scheduled in the contract
- Brief, maquette, crystal tray, then the works
- Drawings, protocol and strand maps in the file
- One-of-one: the drawing retires when the fixture hangs
- Void surveyed; load path calculated into structure
- Numbered sections; nothing improvised at height
Specifications
| Scale | Estate commission |
| Process | Brief → maquette → works |
| Schedule | 12–20 weeks, contracted |
| Crystal | Bohemian, cut to pattern |
| Weight | ≈ 77.2 kg |
| Warranty | 5 yr; pattern kept 15 |
Care
Crystal asks for gloves, patience and off-switches: dust with the current off, wash strand by strand yearly, and let the drops air-dry on a towel rather than a radiator. Brass frames want a soft cloth only — patina is biography, not neglect.
If the sparkle dulls unevenly, the cause is usually a cleaning spray from the supermarket; ours is pH-neutral and film-free, and a bottle lives in every care kit.
Questions, Answered
What is a chandelier winch and do I need one?
A motorised lift that lowers the fixture to arm height for cleaning and bulb changes. Above four metres of hanging height we recommend one; above six we rarely sell without.
How long does a commission take?
Twelve to twenty weeks from approved maquette depending on scale — crystal cutting is the honest bottleneck. The schedule is written into the contract, with the fitting week booked from day one.
The NAVERZIX Promise
One contract, one schedule, one responsible person from survey to the first switch-on; fixed dates in writing, delays compensated rather than excused.